Updates

Last week, the retaining wall at the C1 Cluster was poured. The rockwork for the speaker enclosure was also started. This week, the conduit will be installed. TWG needs to verify the orientation of the speaker frames before they are bolted in. -MGM MIRAGE Design Group

We were waiting on the egress doors and frames to arrive and began work on the wall this week. The wall is scheduled to be complete by the end of the week. The infills have not been inspected yet because the doweling detail has not been approved. THOR needs more information before inspection. -Hamilton Anderson Associates

At the end of August, our crane moved 20 fire shooters and other miscellaneous items onto the site. Lighting at the very top of The Volcano was also installed. -THOR Construction

Sill waiting on the status of fog manifolds. Bombard Mechanical is also waiting for the remainder of the hoses to arrive. New actuators are needed as well, but have 6-10 week lead-time. We'll wait for the actuators to arrive before moving forward. -WET

After receiving approval from WET to continue with guardrail, we are now moving forward with the rockwork and are in the process of blending the edge of the guardrail with the edge of the basin. -Rock & Waterscape Systems